Category Archives: Projects

LOT 304 DRAINAGE IMPROVEMENTS / DMT

LOT 304 DRAINAGE IMPROVEMENTS / DUNDALK MARINE TERMINAL BALTIMORE, MD Client:   Maryland Port Administration Project Start:                 September 2015 Project Completion:     April 2016 Marine Technologies, Inc. Key Personnel: Project Manager:                Luke Browning Project Superintendent:    Steve Grob Owner's Representative:  Robert…
Read more

REBUILD BREWERTON CHANNEL RANGE FRONT LIGHT

Client:   USDHS-USCG / DAL CONSTRUCTION, LLC Project Start:                December 2014 Project Completion:    April 2015 Marine Technologies, Inc. Key Personnel: Project Manager:                Jay Taylor Project Superintendent:    Steve Grob Owner's Representative:  Erica Viteri Phone:  757-873-3488 Project consisted of the demolition…
Read more

HARBOR OF REFUGE DOCKING STRUCTURE

HARBOR OF REFUGE DOCKING STRUCTURE LEWES, DE Client: Moffatt & Nichol Engineers Project Start:                September 2016 Project Completion:    November 2016 Marine Technologies, Inc. Key Personnel: Project Manager:                Luke Browning Project Superintendent:    Dave Capino Owner's Representative:  Paul Sedeese, Project Engineer Phone:…
Read more

CALVERT CLIFFS NUCLEAR POWER PLANT PHASE II

CALVERT CLIFFS NUCLEAR POWER PLANT
PHASE II INTAKE WALL REPAIRS
LUSBY, MD

Client: Calvert Cliffs Nuclear Power Plant

Project Start:                April 2015
Project Completion:   June 2015

Marine Technologies, Inc. Key Personnel:
Project Manager:                Terry Clarke
Project Superintendent:    Mike Williams

Owner's Representative:  Gary O'Connell
Phone:  410-495-4049

Marine Technologies, Inc. returned in the spring of 2015 following emergency waler repairs finished in 2014 to continue with long-term repairs to support a failing waler on a sheet pike bulkhead in 25' of water.  MTI cleaned sheet pile with water blasters, mauls and sledge hammers until there were no loose sections.  A C12x30 waler was installed across a sheet pile bulkhead tied back with helical anchors.  Performance tests were done and all helical anchors were proof tested before being locked off to waler.

In areas where soils were unable to support helical anchor capacity, MTI excavated 10' down to the existing tie rods and inspected, cut and replace crippled tie rods.  MTI welded sheer studs above and below water to sheet pile wall 7' below the failing waler up to an existing concrete sheet pile cap; installed rebar reinforcement above and under water; placed forms and pumped concrete through pumping ports until forms were full and failing waler and rebar were fully encased in concrete.

Calvert Cliffs NPP Phase II (2)Calvert Cliffs NPP Phase II (3)