Client: Maryland State Highway Administration
Project Start: July 2017
Project Completion: September 2018
Marine Technologies, Inc. Key Personnel:
Project Manager: Dustin Hawley
Project Superintendent: Steve Grob
Owner's Representative: Ms. Corren Johnson, District Engineer
Phone: 443-572-5024
Work included, but was not limited to the following: clearing, grubbing and installation of all erosion control devices; flagging in order to install approx. 300 LF of mounted concrete barriers; removal in stages of existing concrete/asphalt bridge deck; repairs of structural steel beams; removal and installation of new bridge bearings; installation of new permanent metal deck pans and all rebar required, to include abutment repairs also; construction of overhang false work to perform concrete paving/placement of bridge deck; pouring new curbs and installation of new bridge rail; sandblasting and painting existing beams; installation and removal of temporary traffic signal; miscellaneous concrete patching on adjacent bridges, and bituminous paving of bridge approaches.