BRIDGE DECK REPLACEMENT ON MD 6 OVER ZEKIAH SWAMP

Client:   Maryland State Highway Administration

Project Start:                 July 2017
Project Completion:     September 2018

Marine Technologies, Inc. Key Personnel:
Project Manager:                Dustin Hawley
Project Superintendent:    Steve Grob

Owner's Representative:  Ms. Corren Johnson, District Engineer
Phone:  443-572-5024

Work included, but was not limited to the following: clearing, grubbing and installation of all erosion control devices; flagging in order to install approx. 300 LF of mounted concrete barriers; removal in stages of existing concrete/asphalt bridge deck; repairs of structural steel beams; removal and installation of new bridge bearings; installation of new permanent metal deck pans and all rebar required, to include abutment repairs also; construction of overhang false work to perform concrete paving/placement of bridge deck; pouring new curbs and installation of new bridge rail; sandblasting and painting existing beams; installation and removal of temporary traffic signal; miscellaneous concrete patching on adjacent bridges, and bituminous paving of bridge approaches.

Bridge over Zekiah Swamp #1 Bridge over Zekiah Swamp #2