Phone Number

LOT 402 DRAINAGE IMPROVEMENTS

Client:   Maryland Port Administration

Project Start:                 November 2016
Project Completion:     October 2018

Marine Technologies, Inc. Key Personnel:
Project Manager:                Jay Taylor
Project Superintendent:    Dave Capino

Owner's Representative:  Jacob Noel, Resident Engineer

Phone:  410-963-5474

Project is located at the Dundalk Marine Terminal and consisted of the construction of an underground, cast-in-place concrete vault, measuring approximately 83'x127'x19' deep to both treat and store surface storm water drainage.  The vault includes a pretreatment area, sand filter, overflow storage area, and pump station/wet well. The pump station consists of two 125 horsepower propeller pumps. Manholes are located along the force main alignment to provide both air release valves and flushing connections. Power to the pump system is provided by a new transformer and panel.  Back-up power is provided by a 250 KW diesel powered generator.

Lot 402 DMT (2)Lot 402 DMT (3)

Comments are closed.