Client: Maryland Port Administration
Project Start: November 2016
Project Completion: October 2018
Marine Technologies, Inc. Key Personnel:
Project Manager: Jay Taylor
Project Superintendent: Dave Capino
Owner's Representative: Jacob Noel, Resident Engineer
Phone: 410-963-5474
Project is located at the Dundalk Marine Terminal and consisted of the construction of an underground, cast-in-place concrete vault, measuring approximately 83'x127'x19' deep to both treat and store surface storm water drainage. The vault includes a pretreatment area, sand filter, overflow storage area, and pump station/wet well. The pump station consists of two 125 horsepower propeller pumps. Manholes are located along the force main alignment to provide both air release valves and flushing connections. Power to the pump system is provided by a new transformer and panel. Back-up power is provided by a 250 KW diesel powered generator.