PIER 7 LOWER DECK DEMOLITION

PIER 7 LOWER DECK DEMOLITION
BALTIMORE, MD

Client:  1800 South Clinton Street LLC

Project Start:                 April 2015
Project Completion:    September 2015

Marine Technologies, Inc. Key Personnel:
Project Manager:                Terry Clarke
Project Superintendent:    Steve Grob

Owner's Representative:  Dan Noar
Phone:  443-667-8904

Project was to demolish a 362' x 50' wide concrete deck located below an existing pier deck. Timber pile supports were cut to 5' below the mean-low water line, thus creating an approximate 362' x 50' wide aquatic habitat comprised of the demolished concrete in the same footprint as the removed deck.  During the demo operations, MTI placed the broken concrete deck onto the bottom of the harbor with a minimum of 5' clearance around the steel piles of the heliport pier. This clearance will permit further inspection and maintenance of the steel piles.

All work was performed in accordance with Wetlands License No. 14-0720.

 