REBUILD BREWERTON CHANNEL RANGE FRONT LIGHT

Client:   USDHS-USCG / DAL CONSTRUCTION, LLC

Project Start:                December 2014
Project Completion:    April 2015

Marine Technologies, Inc. Key Personnel:
Project Manager:                Jay Taylor
Project Superintendent:    Steve Grob

Owner's Representative:  Erica Viteri
Phone:  757-873-3488

Project consisted of the demolition of the pyramidal skeletal tower erected in 1924 near Hawkins Point, Baltimore, MD.  The tower was de-energized and light and solar panels were removed before the complete tower was removed.

The rebuild consisted of driving H piles, pouring concrete base, welding, installation of the ice cone, anodes and solar panels.  Also, the installation of the upper platform with grating and hand rails, and bird deterrents.  An equipment shelter was built along with an optics platform.  Lighting, ladders and miscellaneous equipment were installed.